Fire Code Violation
Appealed City Violation to replace 650 LF of 6" Ductile Iron Fire Pipe for Fire Department Connection by analyzing and proving to Fire Code Unit to install new FDC on wall of building saving our client $150,652.

Roofing Project
Project Management for Re-Roofing of 110,000 SF. Complete tear-off, corrugated metal deck replacement where necessary and installation of Coal Tar Pitch Roof with 20 Years NDL warranty.

Amazon Storm Water Basin
Inspection for full duration of the installation of a Sub-Surface Stormwater Basin (581 ft. x 92 ft.)

Concrete Retaining Wall
Project Management for the installation of 700 LF Concrete Retaining Wall.

High-Pressure Water Jetting Stormwater Basin
High-Pressure Water Jetting of a large underground Stormwater Basin.
3,593 LF of 24" underdrain piping.
Knowledge and understanding the system, elevations, piping connections and other specifics, enable compliance with the Water Department requirements.